Portfolio Archive - WC Consulting, Inc.
0
archive,post-type-archive,post-type-archive-portfolio_page,ajax_fade,page_not_loaded,,no_animation_on_touch,qode_grid_1300,footer_responsive_adv,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-7.2,vc_responsive

Archive

The project included a 16,600 SF facility with a construction budget of $6,100,000 and $775,000 for FFE, as stated in the Project Validation Assessment (PVA). WC Consulting provided architectural product research and design coordination. Coordination of discipline specifications. Project Manual compliance with Department of Defense (DOD) design...

Radiation, Oncology and Mechanical Space: The addition includes three levels. The basement level provides radiation oncology, one linear accelerator vault and supporting services. The upper floors include the childbirth center, surgery addition, cardiac rehabilitation, physical therapy, and an expansion of the outpatient specialty clinics. Rehabilitation and Outpatient: Rehabilitation Services, Conference Room, Canopy and Site...

The East Tower Expansion addition to the hospital added 72 private patient rooms, eight new operating suites, and La Ventana, a new café for the public. Beautifully conceived by Kahler Slater Architects, Inc. of Madison, Wisconsin, the expansion makes use of native stone, wood, tile, and natural...

The administration facility consists of two contiguous structures—an 88,760 square foot, 5-story heavy timber and masonry structure constructed in 1903; and a 78,240 square foot, 3-story concrete frame and masonry structure constructed in 1913. The buildings were used originally by Valspar as manufacturing facilities but have...